Utility Substation Project Highlight

This Utility Substation Design project consisted of installing three new 12KV distribution breakers, a new 12KV feeder protection panel, a new 115/12KV transformer protection panel and a modern SCADA panel. The existing panels in the station were of the electro-mechanical type, with the existing drawings dating back to the 1960’s time frame. Promus was able…