North Georgia

This project replaced an existing 115/25KV transformer protection scheme, as well as two 115KV line switch controls and motor operators. This scope also included removing one 25KV distribution breaker, and replacing another. The station service scheme was updated to the latest modern standard, along with the substation metering package.

This design included upgrades to the DC distribution panels as well.